As we all know, the pole works need to batch into the hole operation, and the duration is limited. So, how to batch into the hole to become the top priority of the whole project! This determines the progress of the entire project.
Pole works
As the auger drilling in a short period of time for the hole into the hole operation, so most of the batch into the hole to use the equipment construction.
Auger, a kind of excavator, installed in the front of the excavator can be used for digging, spiral pile. The auger is suitable for batch forming and piling operations. It is suitable for forming soil, gravel layer, silt layer, sand layer, permafrost layer and strata which can not be drilled with some pebbles and gravel. The use of core drill bits can also be embedded in rock formations. Construction of low noise, low vibration, torque, hole into the fast.
Regular volume into the hole operations
The auger utilizes the power of the excavator, consisting essentially of a drive head and a drill bit assembly, which is fixedly connected to the bit assembly, which comprises a drill pipe, a helical blade surrounding the drill pipe, and a drill bit or helix disposed at the end of the drill pipe And the bottom end of the spiral blade is provided with a drill bit.
The staff generally use the auger to carry out batch drilling operations, and then use the excavator or crane to place the pole in the hole fixed.