HOME ABOUT US PRODUCTS NEWS CENTER QUALITY CONTROL CONTACT US REQUEST A QUOTE
PRODUCT CATEGORIES
Piling Equipment
Excavator Attachments
Excavator Spare Parts
  • CE Certificate
  • ISO9001:2008
  • CONTACT US
    BeiYi Excavator Parts Factory
    Shuangmiao Industry Park A,Luoshe Town,Huishan District,Wuxi,Jiangsu,China
    beiyipilebreaker@163.com
    86-0510-85450099
    View Contact Details
    I'm Online Chat Now
    News Center - Wuxi BeiYi Excavator Parts Factory
    In the permafrost on a large number of hole operations with auger
    2017/9/4 9:20:56
     As we all know, the pole works need to batch into the hole operation, and the duration is limited. So, how to batch into the hole to become the top priority of the whole project! This determines the progress of the entire project.
    Pole works
    Pole works
        As the auger drilling in a short period of time for the hole into the hole operation, so most of the batch into the hole to use the equipment construction.
        Auger, a kind of excavator, installed in the front of the excavator can be used for digging, spiral pile. The auger is suitable for batch forming and piling operations. It is suitable for forming soil, gravel layer, silt layer, sand layer, permafrost layer and strata which can not be drilled with some pebbles and gravel. The use of core drill bits can also be embedded in rock formations. Construction of low noise, low vibration, torque, hole into the fast.

    Abrasive drilling machine permafrost, hard hole into the hole
    Regular volume into the hole operations
    Regular volume into the hole operations
        The auger utilizes the power of the excavator, consisting essentially of a drive head and a drill bit assembly, which is fixedly connected to the bit assembly, which comprises a drill pipe, a helical blade surrounding the drill pipe, and a drill bit or helix disposed at the end of the drill pipe And the bottom end of the spiral blade is provided with a drill bit.
    The staff generally use the auger to carry out batch drilling operations, and then use the excavator or crane to place the pole in the hole fixed.
    Batch hole operation
    Batch hole operation
    Permafrost environment
    Permafrost environment
       
    Contact Details
    BeiYi Excavator Parts Factory
    Shuangmiao Industry Park A,Luoshe Town,Huishan District,Wuxi,Jiangsu,China
    beiyipilebreaker@163.com
    86-0510-85450099
    View Contact Details
    From: Enter your Email ID please.
    Send your inquiry directly to us
      (0 / 3000)
    Excavator Attachments
    BYD 45S/68S Hydraulic Breakers-excavator hydraulic hammer
    BYD 75S/85S Hydraulic Breakers-hydraulic hammers
    BYD 100S/135S Hydraulic Breakers-concrete demolition
    BYD 140S/150S Hydraulic Breakers-pile breaking
    Piling Equipment
    Mini excavator
    BYPM300LS-200*500mm H-beam pile extractor-H beam pile extractor
    BY-PB600LQ Even wall hydraulic pile breaker-Hydraulic pile breaker
    BY-VH250 Vibratory pile driver-excavator mounted vibro hammer
    Excavator Spare Parts
    Cylinder Assembly Excavator Spring Assy
    Excavator Recoil Spring Assy for Multiple Vehicle
    Cylinder Assembly Parts Excavator Tension Spring
    Hquality Recoil Spring Assy Heavy Duty Torsion Spring
    Request A Quote
    Shuangmiao Industry Park A,Luoshe Town,Huishan District,Wuxi,Jiangsu,China
    beiyipilebreaker@163.com
    86-0510-85450099
                   
     

    Copyright © 2019 无锡市北奕挖掘机配件制造厂 版权所有

    苏ICP备12079341号-1


    TEL : 86-0510-85450099   E-mail : beiyipilebreaker@163.com