    Excavator installation pile driver steps
    2017/6/24 15:28:31
    Guidance:At present, most of the process of construction of the use of broken hammer blow, artificial drill or pick removal method and other methods to remove the pile head method; However, the traditional method of the existence of a variety of disadvantages
    Artificial buzzing bucket
    Artificial buzzing bucket
    Artificial buzzing bucket
    1, although the broken hammer crushing operation efficiency is high, but because of poor combat control, so often the pile head should be completely retained part of the internal structure of the earthquake, the construction of the project has brought security risks; generally break the pile head is generally Does not apply to the hammer, the hammer is generally used for crushing operation efficiency is still very high.
    2, although the artificial brazing hammer percussion method vibration is small, but each time to lay the concrete block only cobblestone size, labor intensity, broken efficiency is low, and the effect of reinforced concrete is not obvious. If the pile head is rarely the case can still be considered, the cost of pre-investment than to buy a pile of machines to be more economical.
     concrete pile
     concrete pile

    So now the construction needs of a high efficiency, high safety factor broken pile equipment instead of artificial, to speed up the construction. So how does the pile driver pile up how it works? The following BeiYi machinery for everyone to do a brief description:
    hydraulic pile breaker
    hydraulic pile breaker
    Installation steps of pile - driving machine
     1, according to the construction pile diameter, refer to the construction reference table to determine the number of combinations of modules.
     2, connect the modules together, first insert the main fixed shaft, and then insert the positioning pin.

     3, the installation of drill rod: the pile driver pile cutter block module rod fully extended, the "long sets" of "short sets" were set into the piston rod
     4, adjacent modules with cylinder corresponding to the corresponding, corresponding to a good oil and oil interface.

     5, the excavator bucket removed, in the bucket and the arm connection shaft hanging pile driver pile hoisting machine chain.
    6, the excavator of the arm hydraulic circuit through the balance valve connected to the pile of the pile of the pile of oil on the road to drive the pile of the pile of the machine.
    hydraulic pile breaker
    hydraulic pile breaker
    BeiYi machinery production of the pile driver is a combination of concrete structure characteristics of the research and development of a new and efficient concrete structure to break the equipment. Reduce the labor intensity of workers, improve the efficiency of the project. For example, need to break a diameter of 1 m, 2 meters long piles need 9 modules to be combined, broken 4 times can be completely broken, the time only takes 10 minutes can (only as a reference, concrete structure slightly different)
    hydraulic pile breaker
    hydraulic pile breaker
    hydraulic pile breaker

    Welcome to visit, buy equipment! Look forward to working with you

    china beiyi demolition machine pile breaker price Tel: 0510-85167600

    24-hour hotline (switchboard):+86 18006176550

    Factory Address: Shuangmiao Village Shuangmiao Industrial Park A District,Luo Town,Huishan District, Wuxi City, Jiangsu Province,china. 
       
    Contact Details
    BeiYi Excavator Parts Factory
    Shuangmiao Industry Park A,Luoshe Town,Huishan District,Wuxi,Jiangsu,China
    beiyipilebreaker@163.com
    86-0510-85450099
    View Contact Details
    From: Enter your Email ID please.
    Send your inquiry directly to us
      (0 / 3000)
    Excavator Attachments
    BYD 45S/68S Hydraulic Breakers-excavator hydraulic hammer
    BYD 75S/85S Hydraulic Breakers-hydraulic hammers
    BYD 100S/135S Hydraulic Breakers-concrete demolition
    BYD 140S/150S Hydraulic Breakers-pile breaking
    Piling Equipment
    Mini excavator
    BYPM300LS-200*500mm H-beam pile extractor-H beam pile extractor
    BY-PB600LQ Even wall hydraulic pile breaker-Hydraulic pile breaker
    BY-VH250 Vibratory pile driver-excavator mounted vibro hammer
    Excavator Spare Parts
    Cylinder Assembly Excavator Spring Assy
    Excavator Recoil Spring Assy for Multiple Vehicle
    Cylinder Assembly Parts Excavator Tension Spring
    Hquality Recoil Spring Assy Heavy Duty Torsion Spring
    Request A Quote
    Shuangmiao Industry Park A,Luoshe Town,Huishan District,Wuxi,Jiangsu,China
    beiyipilebreaker@163.com
    86-0510-85450099
                   
     

    Copyright © 2019 无锡市北奕挖掘机配件制造厂 版权所有

    苏ICP备12079341号-1


    TEL : 86-0510-85450099   E-mail : beiyipilebreaker@163.com