Guidance:At present, most of the process of construction of the use of broken hammer blow, artificial drill or pick removal method and other methods to remove the pile head method; However, the traditional method of the existence of a variety of disadvantages
Artificial buzzing bucket
1, although the broken hammer crushing operation efficiency is high, but because of poor combat control, so often the pile head should be completely retained part of the internal structure of the earthquake, the construction of the project has brought security risks; generally break the pile head is generally Does not apply to the hammer, the hammer is generally used for crushing operation efficiency is still very high.
2, although the artificial brazing hammer percussion method vibration is small, but each time to lay the concrete block only cobblestone size, labor intensity, broken efficiency is low, and the effect of reinforced concrete is not obvious. If the pile head is rarely the case can still be considered, the cost of pre-investment than to buy a pile of machines to be more economical.
concrete pile
So now the construction needs of a high efficiency, high safety factor broken pile equipment instead of artificial, to speed up the construction. So how does the pile driver pile up how it works? The following BeiYi machinery for everyone to do a brief description:
hydraulic pile breaker
Installation steps of pile - driving machine
1, according to the construction pile diameter, refer to the construction reference table to determine the number of combinations of modules.
2, connect the modules together, first insert the main fixed shaft, and then insert the positioning pin.
3, the installation of drill rod: the pile driver pile cutter block module rod fully extended, the "long sets" of "short sets" were set into the piston rod
4, adjacent modules with cylinder corresponding to the corresponding, corresponding to a good oil and oil interface.
5, the excavator bucket removed, in the bucket and the arm connection shaft hanging pile driver pile hoisting machine chain.
6, the excavator of the arm hydraulic circuit through the balance valve connected to the pile of the pile of the pile of oil on the road to drive the pile of the pile of the machine.
hydraulic pile breaker
BeiYi machinery production of the pile driver is a combination of concrete structure characteristics of the research and development of a new and efficient concrete structure to break the equipment. Reduce the labor intensity of workers, improve the efficiency of the project. For example, need to break a diameter of 1 m, 2 meters long piles need 9 modules to be combined, broken 4 times can be completely broken, the time only takes 10 minutes can (only as a reference, concrete structure slightly different)
hydraulic pile breaker
Welcome to visit, buy equipment! Look forward to working with you
china beiyi demolition machine pile breaker price Tel: 0510-85167600
24-hour hotline (switchboard):+86 18006176550
Factory Address: Shuangmiao Village Shuangmiao Industrial Park A District,Luo Town,Huishan District, Wuxi City, Jiangsu Province,china. |